Meeting

From W&M Group at JLab

Jump to: navigation, search

Contents

Collaboration Meeting


May 2012 Collaboration Meeting

Oct 2012 Collaboration Meeting

GRINCH Meeting


Analysis Meeting

   Analysis on CO2 data (Run 2050)
   Analysis on lucite data with G2p Runs(Run 2081)
   Analysis on lucite data with optimized DAQ and GEp Runs(Run 2116-2119)
   Analysis on lucite data after moving lucite close to mirror(Run 2125)
   Analysis on lucite data after rotating blue pedestal 6.4 deg and replace T4 with small scintillator(Run 2131)
   Analysis on lucite data for last run(Run 2132)

Other Meeting


Personal tools